Hlmekat SA. is able to fully undertake the whole process of design and construction of a wind park due to our previous experience and the appropriately trained engineers and stuff we have. The feasibility in the form of “turn-on-key” includes the following activities:

DESIGN AND PLANNING STAGE

  1. All the Licensing process by public services.
  2. Topographical studies and road construction
  3. Static studies
  4. All the necessary studies regarding Building permissions
  5. Complete design of electrical installations
  6. Grounding studies
  7. Studies of internal network
  8. Study of High/Medium Voltage Substation

CONSTRUCTION STAGE

  1. Construction of squares, streets and all kinds of earthworks
  2. Construction of internal and external electrical network either overhead or underground
  3. Construction of High/Medium Voltage Substation
  4. Construction of Optical fiber network
  5. Construction of Control Room
  6. Testing and measurement
  7. Wind Park Maintenance

Ιnfo:

A wind farm is a group of wind turbines in the same location used for production of electricity. A large wind farm may consist of several hundred individual wind turbines, and cover an extended area of hundreds of square miles, but the land between the turbines may be used for agricultural or other purposes. A wind farm may also be located offshore.

Almost all large wind turbines have the same design — a horizontal axis wind turbine having an upwind rotor with three blades, attached to a nacelle on top of a tall tubular tower. In a wind farm, individual turbines are interconnected with a medium voltage (often 34.5 kV), power collection system and communications network. At a substation, this medium-voltage electric current is increased in voltage with a transformer for connection to the high voltage electric power transmission system.